Skip to content
Albums
Back to Boating
2003
House
Irene60
Paintings
Sharon50
Page :
1
|
2
|
3
|
4
Buying our house in Moissac
Moissac house
Arts Festival in our road 2010
Viewing the house July 2010
Front bedroom before any work
Lovely sunny back bedroom
Viewing house and garden, we saw our first boat passing by end of garden
Lounge and fire place
Basement steps
Barge Rosa, cruising by our house
September 2010 start renovating
Work commenced on basement
Kitchen work commences, stripping out old pipes and boiler
Hall stairs with the door to basement
Before the garden was tackled
Old kitchen fire place
Hall and Lounge
Gable window in loft after cleaning this room
Tea room in Kitchen was set up
Kitchen tea room
John and Jackie dig out the basement floor
Mick giving John a lesson on how to rewire the house, drawing maps on all the wall's
The first job was basement, a new concrete floor and tanking and the start of new walls
Lounge and hall door's in the Kitchen taken from back door
John working in basement
October 2010
Garden is cleared in October by Tina, Irene and John
Tina working hard in garden
We hire a big van and fill it three times, with all the material's we will need for next few months
View of hall and lounge
New Stud wall's go up in loft
Insulation goes in the roof
John starts top floor wiring
New stud walls in the loft, built for the new electric supply and book case
New ensuite wall is built in loft
Helping hands are many in lifting and grafting
John has his electricians hat on today, he has many other talents
Irene clearing garden
Tina and I tackle garden
Lunch's were many during Sept, Oct, Nov and Dec
David helps strip back bedroom wall's
Rosie helping strip back bedroom
Rosey and I working on wall's in back bedroom
David and Rosey helping with clearing back bedroom
Ursula and Family visit
November 2010
Glass blocks and wall commence
New loft window goes in
We now have light in loft, great window size, winter sunshine floods in
New wall window goes in, we can now look down into canal
Wonderful light in loft now
Insulation goes into new ensuite
Wardrobe in loft
We have light, this hole took forever to make, wall's so thick
Back bedroom is a lovely sunny room, so this now becomes our canteen
Landing window
Michael knocks through the outside kitchen wall, light breaks through into the kitchen
We now have an opening ready for kitchen window
New Kitchen window was added
John fits a new kitchen window
New gutters and fall pipe
John building glass block wall for en suite bathroom in loft
John builds wall for insulation loft
Eric leanding hand
Polly helps me paint en-suite
December 2010
New Window goes in stair well
New wall's now built in ensuite
Walk in wardrobe almost complete, door goes in
Stud wall's in loft almost complete - wiring in place, plugs for bedside lamps go in
Our view from new window
Colours of garden in Dec 2010
Loft space with new bathroom glass divider is completed
New skirting boards are added in loft
We paint the loft then comes cleaning and staining the beams
Rest and sunshine time in our canteen (back bedroom)
Back bedroom, the old ceiling is filled, painted, the old light cleaned and re-painted
Tina and I stack all the rubble from the house
Starting work on next door number
Help from Iain, David, Tom stripping, filling wall's in hall's
Iain lends a a hand for the day, plastering work on stairs begins
Tom helps remove all the wall paper from hall
Lunch's in our canteen were often a celebration of work completed
Restoring window in loft
Locks and window furniture re-painted
Locks and handles removed from loft window
New tea room in back bedroom. Jan 2011
New stair velux goes in
roof light goes in on stairs
Our new windows are all now in
Tina and I painting back bedroom with first coat of paint
Tina and I staking rubble against wall in garden
Tina and I work hard in garden
Early snow in Moissac
John and Irene, break for Christmas
Moet wins 1st prize in Christmas light competition
Page :
1
|
2
|
3
|
4